Why Businesses Are Adopting Workplace EV Charging
In the UK, 473,348 electric cars were sold in 2025, representing a 23.9% increase compared with 2024. As organisations begin shifting their fleets away from petrol and diesel vehicles, and more employees choose electric vehicles due to government incentives for their daily commutes, workplace charging points are becoming increasingly important.
With government support available through the OZEV Workplace Charging Scheme, many businesses, educational institutions and public sector organisations are now installing charging infrastructure at a significantly reduced cost.
Utility Bidder supports this transition by ensuring your electricity contract, business electricity tariff and wider business energy strategy remain cost-effective, whether EV charging is provided free of charge, billed back to users, or operated on a pay-as-you-go basis through a third-party provider.
Speak to an energy expert todayOverview of Workplace EV Charging
Workplace EV charging typically involves installing electric vehicle chargepoints in car parks, staff parking areas, or fleet depots. Most businesses use a mix of:
- Fast chargers (7kW-22kW) for staff and visitor vehicles.
- Rapid chargers (50kW+) for fleet turnaround.
- Smart chargers that align charging with off-peak business electricity rates.
EV charging increases electricity demand at a site and may affect its electrical capacity, particularly where multiple chargers are used simultaneously. While charging costs can be passed on to users through pay-as-you-go models, increased demand can still influence tariff suitability, standing charges, and peak usage costs. Selecting the right business electricity supplier and tariff helps ensure EV infrastructure is supported without avoidable expense.
Understanding the OZEV (Office for Zero Emission Vehicles) Workplace Charging Scheme
The Workplace Charging Scheme (WCS) is a government grant designed to reduce the upfront cost of installing workplace EV chargepoints.
What the OZEV Grant Offers Businesses
- Up to 75% off the total cost of purchasing and installing EV chargers, capped at £350 per charger socket.
- Up to 40 sockets per organisation. For example, if a business operates 40 sites, it may be able to install one socket at each location.
- A maximum potential saving of £14,000.
Who Can Apply?
- Private businesses of all sizes.
- Public sector organisations.
- Education and training institutions.
- Charities and not-for-profit organisations.
- Fleet operators and logistics businesses.
What You Need to Apply
- A dedicated off-street parking space for staff or fleet use. If you do not own the property, you will need permission from the landowner.
- An OZEV-approved chargepoint installer.
- A basic plan outlining why chargers are required and where they will be installed.
- A site survey completed by an installer before applying for the grant.
The grant does not affect your electricity contract, but your contract will affect the cost of running the chargers. Reviewing your business electricity deal before installation can help prevent unexpected increases in energy costs.
Costs and Savings: What Businesses Need to Know
When EV charging is added to a site, electricity usage increases. How this affects costs depends on how charging is managed. Some businesses cover the cost, while others pass it on to drivers through pay-as-you-go or cost-recovery models. In all cases, increased demand can influence electricity tariffs and site capacity.
Tariff Suitability
If your current electricity contract has a high unit rate or standing charge, charging vehicles could become more expensive than necessary.
Peak Demand
Some tariffs penalise electricity usage during daytime peak periods. If your business charges vehicles during these times, overall costs may increase.
Contract Alignment
If your contract is approaching renewal, it may be an ideal opportunity to switch business electricity suppliers and secure a tariff that better supports EV charging infrastructure.
How EV Charging Supports ESG and Business Sustainability Goals
Workplace EV charging can contribute directly to a company’s sustainability strategy by:
- Reducing emissions from employee travel and business fleets.
- Supporting corporate ESG policies and reporting requirements.
- Strengthening brand reputation with environmentally conscious employees and customers.
- Helping businesses meet government climate expectations and industry-specific sustainability standards.
Pairing workplace charging with renewable electricity can strengthen carbon reduction outcomes and help future-proof an organisation’s energy strategy.
Talk to an Energy ExpertWhich Organisations Do Not Qualify for OZEV Support
Some businesses in the UK are generally unable to receive OZEV grants if they do not meet criteria relating to registration, location, or usage.
Key Types of Ineligible Businesses
1. Unregistered or Non-VAT Registered Businesses
Businesses that are not registered with Companies House or are not VAT registered with HMRC are not eligible. Sole traders or partnerships without a formally registered business premises are also excluded.
2. Businesses with Mandatory Installation Requirements
If a business is required to install EV chargers by law, such as under Part S of the Building Regulations in England, it is not eligible for a grant. This also applies where planning permission requires chargers, including new builds or major renovations where charger installation is mandatory.
3. Incorrect Location or Parking Arrangements
A business is ineligible if:
- The site is outside the UK, including the Channel Islands or the Isle of Man.
- No dedicated, private, off-street parking is available.
- The parking is for customers only rather than employees or fleet vehicles.
- The property is a home and has not been registered as a place of work.
4. Over-Subsidised Businesses
Any business that has already received more than £315,000 in Minimal Financial Assistance over the previous three financial years cannot claim further support.
5. Restrictions Based on Grant Type
- Commercial landlords cannot apply for the EV Infrastructure Grant for Staff and Fleets. However, they may apply for the EV Chargepoint Grant for Landlords.
- Businesses that rent space within a property where the landlord also lives on site are not eligible.
6. Retrospective Applications
A business cannot apply if charging infrastructure has already been installed before the application is submitted.
Additional Important Notes
- 40 Socket Limit: A business may claim support for no more than 40 individual charging sockets through the Workplace Charging Scheme (WCS) in total.
- Scheme End Dates: OZEV will end or change several grants, including the SME Infrastructure Grant, on 31 March 2026.
Why Partner With an Energy Broker?
An experienced energy broker like Utility Bidder adds value throughout the EV transition by helping you:
- Ensure your electricity contract is suitable for increased consumption.
- Avoid peak-time tariffs or standing charges that inflate running costs.
- Compare business electricity prices across multiple suppliers.
- Secure cheaper business electricity deals tailored to EV usage.
- Simplify contract management for multi-site or fleet-heavy operations.
- Prevent automatic rollovers onto higher commercial electricity rates.
- Save time by handling the comparison and switching process for you.
Frequently Asked Questions:
Yes, EV charging increases electricity usage at a site, which can increase costs where the business pays for electricity. However, costs can be managed through appropriate tariff selection, charge management, and off‑peak or smart charging strategies.
Yes, most can. The Workplace Charging Scheme offers up to £350 per connector for up to 40 sockets.
Yes, many businesses choose renewable electricity tariffs to support ESG targets and reduce carbon emissions.
Most EV‑friendly tariffs require a smart meter to track usage and access off‑peak rates.
Don’t take our word! Listen to our customers
Award-winning energy comparison
We’re dedicated to helping businesses like yours save more on energy. It only takes a couple of minutes to compare quotes.