What is P432?
Ofgem has now approved the BSC modification P432, which will require new meter connections with current transformer meters to be moved to a half-hourly basis from the modification’s implementation date of the 15th of April 2024.
The integration of the P432 modification is happening as part of a comprehensive plan aimed at coordinating usage and capacity in the UK, while also enabling businesses to adhere to net-zero standards.

How to identify if you have a half-hourly meter?
A half-hourly meter, also known as HH or 00) is a business electricity meter that sends usage data to your energy supplier every half an hour. This modification changed the way you are billed for electricity usage and brought in some additional charges that you need to be prepared for.
To identify if you have a half-hourly meter, simply check the Meter Point Administration Number (MPAN) on your electricity bill, if your profile class (the first two-digit number in the box to the immediate right of the ‘S’) is 00, then you have a Half Hourly Meter.
What are the advantages of the P432 modification?
The implementation of the P432 modification will incentivise suppliers to introduce new small business energy tariffs aimed at promoting flexible energy usage and assisting customers in reducing their bills. As a result, the P432 modification is set to deliver significant benefits to customers.
As a result, the P432 modification is set to deliver significant benefits to customers. These benefits primarily stem from the optimisation of infrastructure investments.
The P432 modification is a replacement for the original P272 modification. All small businesses that use electricity meter profile classes 05 – 08 were upgraded to a half-hourly meter as part of P272.
How will P432 impact you?
This new P432 modification offers opportunities for consumers to review their energy consumption and utilise the benefits of available flexible tariffs. To navigate this change effectively, we recommend contacting our team of energy experts. Our team can help you compare business energy options secure the best tariffs for your business’s energy needs.
Statement from Ofgem regarding the P432 modification
“Currently, generators and suppliers trade electricity in the wholesale market in half-hourly periods, but most customers are settled on a ‘Non-Half-Hourly’ (NHH) basis, using consumption estimates based on profiles of average customers and meter readings. There can be considerable variances between these estimates and actual usage. Market-wide half-hourly Settlement (MHHS) will use smart meters to send accurate signals to suppliers about the cost of serving their customers throughout each day. This will place incentives on suppliers to offer new tariffs and products that encourage more flexible use of energy and help customers lower their bills. MHHS will, therefore, bring significant benefits to customers and wider society.
BSC modification P432 was first submitted to Ofgem for the decision on the 20th of July 2022. However, the Final Modification Report (FMR) did not provide sufficient evidence that affected consumers would not be negatively impacted by increasing costs, by way of capacity charges, if migration were to be delivered on the existing implementation timeframe, or that the timeframe specified was necessary to de-risk overall MHHS implementation. We were therefore unable to decide. We sent the modification back to the BSC Panel on the 26th of August 2022 to be revised” – Melissa Giordano, Deputy Director of Retail
Conclusion
In conclusion, the main benefit of P432 is to minimise the risk the migration to the MHHS (market-wide half-hourly settlement) and improve settlement accuracy. This Modification will impact Suppliers, Generators and Distributors and have a minor impact on NHHDA (Non-Half Hourly Data). They may be required to amend systems and processes, but implementation and ongoing costs are expected to be low. If you have any further questions, speak to our energy experts today to find out more.
What is the status of P432?
Check out the links below to further understand the status of the P432 modification:
https://www.ofgem.gov.uk/sites/default/files/2024-01/P432%20Approval.pdf
Don’t take our word! Listen to our customers
Award-winning energy comparison
We’re dedicated to helping businesses like yours save more on energy. It only takes a couple of minutes to compare quotes.